This article is reproduced from: Datong Daily
|
4月13日拍攝的崇啟公鐵長江大橋4號主塔(中)第17節澆築施工現場(無人機照片)。
日,由中鐵大橋局承建的崇啟公鐵長江大橋4号主塔第17節澆築完成,塔身高度突破100米,大橋進入上塔柱施工階段。
The Chongqi Railway Yangtze River Bridge is a key control project of the Shanghai-Chongqing-Rong high-speed railway, with a total length of 09.0 kilometers across the north branch of the Yangtze River, and is the main connecting channel between Qidong, Jiangsu Province and Chongming, Shanghai.
Xinhua News Agency (photo by Xu Congjun)