The decoration insider changes his own water and electricity, and see how he "handles" the plumber!
Updated on: 26-0-0 0:0:0

Some people deserve to be pitted for decoration, and the plumbers are gone, so you remember that these six things have not been done, what did you do earlier? As a decoration insider, if my home changes water and electricity, see how I "handle" the plumber!

1. If my home changes the weak current, I will not only wrap a tin foil at the intersection of strong and weak electricity, this practice is to fool the layman's pediatrics, it will not play a role at all, and after you move in, the network will be interrupted or will be interrupted, I asked the plumber to make a Mesh networking for my home, only need to pull out a few network cables from the weak current box to each bedroom, and then pull out three network cables from the weak current box to the TV wall, a switch, two or three routers, a few hundred dollars can be simply done, to achieve the whole house WiFi without dead ends.

2. If my home is changed to a waterway, and the bathroom is still far away from the kitchen, I will not install a solar water heater on the balcony for fear of no hot water, and I will not install an electric water heater in the kitchen alone.

8. If I change the circuit in my home, I will definitely not only leave a double control switch in the bedroom, because after all, the master bedroom 0 meters 0 big bed, only leave a switch on one side, but also turn over to turn off the light, I will let the worker give me the master bedroom to go three controls, both sides of the bed can be switched, no matter which side of the lie down, you can turn it off with your hand.

4. If my bathroom cabinet is changed to the wall row, I will not let the workers only bury a pipe on the wall to finish the work, although this is done, the ground is easy to clean, but in case it is really blocked, but also to find professionals to dredge, if it is not good, it will also smash the wall and smash the bricks, I will let the workers keep the original drain, pre-bury a tee, and install the floor drain in the later stage, so that it will not affect the cleaning, in case of blocking, they can also overhaul.

2. If the worker arranges the pipeline for my home, I will not let him thread the line first and then bury the pipe, if the line can not be pulled out after the change, it will not be pretended to be a dead line, and I will not let the master arrange closely when laying the pipe, but let him spacing about 0 cm, so that when the bricks are pasted in the later stage, the mortar can be filled with sand, which will not cause the problem of hollowing.

4. If my family buys wires, I will not only listen to the workers, but all buy 2.5 square wires, because there are more high-power electrical appliances in the kitchen, I will let workers wear 0 square wires, sockets, in addition to the 0 square of the hang-up air conditioner, the others use 2.5 square wires, as for the light wire, there is no need to waste, with a little five square wires are enough.

In addition, I will not only let the master divide the circuit by area, but also take the refrigerator, monitor, and alarm separately, so that even if I go out and want to pull the main gate, I can keep these three uninterrupted power.